RASTRIYA BANIJAYA
BANK CENTRAL OFFICE COMPLEX
|
| Situated in a very prime location
of Kathmandu, the capital city of Nepal, this modern office
complex was built by Sharma & Company during May 1995
to Nov. 1997 for one and only Government owned and largest
Commercial Bank of Nepal. The total floor area of this building
is 105,800 sq ft. The design of this building was done by
Rachana Consulting Architects and the construction cost of
this building amounted to NRs. 114,362,377.00. The building
represents the perfect combination of traditional and modern
architecture in Kathmandu Valley. The Company was awarded
a gold medal as best building constructor for this building.
The honor was awarded during 30th IFAWPCA convention held
in Kathmandu. |
TRIJUGA
BRIDGE PROJECT |
 |
| This 326 mtr long RCC Bridge built by the company
is one of the longest bridges in Nepal. This bridge built
over Trijuga River near historical Chandra Canal Barrage links
Saptari and Udayapur districts of Nepal. This bridge rests
on 14 well foundations of 6 mtr. depth. This bridge was built
during August 1998 to April 2002 at a cost of NRs. 107,341,472.00.
The supervision of this bridge was done by Eastern Division
Road Office, DoR/HMG/N. |
|
ARNIKO HIGHWAY
ROAD PROJECT |
| This Suryabinayak to Dhulikhel
Section (Km 14+000 to Km 30+000) of Arniko Highway was widened
and upgraded with Asphalt Concrete during August 1999 to June
2002 by the Sharma & Company, This section, a strategic
portion of Arniko Highway, joins Kathmandu Valley Urban area
with famous touristy area of Dhulikhel. This part of the project
was funded by Swiss Government in continuation of their 10
years program to upgrade Arniko Highway. The consultant of
the project was the joint venture of SILT-SUB STRUCTURAL &
MEH and quality was monitored by Swiss expert as well. The
construction cost of this project was NRs. 330,015,579.00. |
KANTI
CHILDREN'S HOSPITAL |
 |
| The Contract for the extension of the only
Children’s Hospital in Nepal. Kanti Children Hospital
was funded by Japanese Government. The work for this contract
was entrusted to us by TODA Corporation, Japan. S&C had
the opportunity to be co-worker with Japanese Counterpart
in this Project. All the civil, sanitary & electrical
works were done by S&C. The consultation for the project
was Nippon Koi, Japan and the Project was completed in 1995 |
|
TRIBHUVAN INTERNATIONAL
AIRPORT IMPROVEMENT PROJECT |
| The company has the privilege of completing Tribhuvan International Airport Fire Station & Airfield Maintenance and Radar Facilities works under TIAIP. The works comprised of related buildings, approach road, land scaping, drainage as well as other physical infrastructures. These works were part of Tribhuvan International Airport modernization program funded by ADB & Japanese Government. The consultants were ANL Consortium & Nippon Koi. The project was completed in two phases at the cost of Rs. 119,564,780 & Rs. 17,991,598 |
AGRICULTURAL
INSTITUTE COLONIES |
 |
| Among our completed construction projects the
construction for Agricultural Institute Colonies are no less
notable. We have constructed infrastructures and physical
facilities for IAAS. Rampur at a cost of Rs. 32,982,000 during
1997-1983. Agricultural Manpower Development Centers at Lamjung
and Pakihawa at the cost of Rs. 59,441,978 during 1987-1989.
The projects were funded by USAID and World Bank for Agricultural
Manpower Development Program for Tribhuvan University and
the works included were academic buildings, workshops, laboratories,
internal roads, water towers, electrification and sewerage
works. |
|
CHAMELIA BRIDGE
PROJECT |
3span steel truss bridge built
over Chamelia River in far west Nepal.
Cost: NRs. 58.37 Million
Length: 122M
Employer BDRP/DOR
Consultant: Soil Test
|
NEPAL
SHARE MARKET'S COMMERCIAL COMPLEX |
 |
Cost: NRs. 81,169,279.00
Area: 58.000 Sft.
Client: Nepal Share Market Ltd.
Location: Putalisadak, Kathmandu
|
|
BUMP BRIDGE
PROJECT |
Cost: NRs. 53,422,061
Span: 104m.
Funding Agency: DFID
Client: BUMP/DOR
Consultant: WSP International &GEOCE
Location: East-West National Highway
Nawalparasi, Morang
|
TANSEN
- SYANGJA ROAD PROJECT |
 |
Cost: NRs. 224,965,975
Length: 85Km. (0+000 to 85+064Km)
Consultant: WSP International & GEOCE
Client: RMDP/DOR
Funding Agency: World Bank
Location: Siddhartha Highway, Palpa- Shyangja
|
|
ATARIA - CHAUDAR
ROAD PROJECT |
Cost: NRs. 134,214,386
Length: 36Km. (12+260 to 48+570Km)
Client: RMPR/DOR
Consultant: GEOCE & SLIT
|
|
|